top of page



1/2
Factory Adminis- trative Office
The project was designed as an annex hosting administrative and social spaces, to an existing factory building, which produces metal surfaces. Situated on a plot facing the ring road, the design features a façade concept that expresses the nature of the production taking place in the factory.
Location | Sakarya
Type | Consept project
Project year | 2024
Construction area | 2.700m2
Team | Pınar Gökbayrak, Ali Eray, Burçin Yıldırım, Elif Ay, Özlem Dündar
bottom of page